Deployment & integration
A first use case can be deployed within a few weeks.
Indao is designed for a progressive, targeted rollout without disrupting operations, with first measurable results delivered quickly.
An Indao project consists of defining a priority use case, connecting existing data, deploying the solution on a targeted scope and measuring tangible gains with operational teams.
No. Indao is designed to minimise the need for internal resources by leveraging existing data and providing structured support.
Yes. Indao allows you to start with a targeted scope, then progressively expand use cases, equipment and sites.
Indao connects by interfacing with existing industrial systems (SCADA, historians, MES, ERP), enabling data to be leveraged without modifying the current architecture.
Yes. Indao is designed to connect to your existing environment, leverage available data and integrate without disrupting your current systems.